Suchergebnisse für 'infrarouge lampe pour séchage de la peinture'
-
1000W infrared curing lamp for powder coating type 602003
1.With a temperature measuring setting function.
mehr dazu
2.It can rorate 300 degrees.
3.It can be baked to any position of small and medium sized cars.
4.Electric performance is stable.
5.It can be quickly raise the temperature. -
3PCS mercedes glow plug removal tool set 138305
Name: 3PCS mercedes glow plug removal tool set
mehr dazu
SKU: 138305
Content:
1PC-Glow Plug Puller
1PC-M10*1.5 9mm Reamer (For 8mm Plugs)
1PC-M12*1.75 7.3mm Reamer (For 10-12mm Plugs) -
DTN Series DN Series Spot Welding Different Model 364003
DTN Series DN Series Spot Welding Different Model 364003-364008:
Features:
DTN series spot welding is the Pneumatic resistance welding machine,combine the spot welding function with the projection welding function.Accurate control since form a complete set of microcomputer controller and the working stroke is stepless.The body of machine is made by bending and welding steel sheets,which makes the products high strength and stability weld.The overall used the modular installation which compact , reasonable structure and convenient maintenance.Widely used in car,metal plate,aviation and Machine building industry. It can perform a high quality of spot welding and projection welding to low steel,stainless steel and coated steel.
mehr dazu -
High quality diesel injector removal tools set 138032
Contents:
mehr dazu
1PC-Pulling Bridge
3PCS-Bridge Legs
1PC-10mm Security Hex Key
2PCS-Injector Cap Sockets: 25mm, 29mm
2PCS-Injector Force Screw Threads:
17*1mm Male Pitch, 25*1mm Pitch
1PC-Injector Force Screw Nut -
Great Quality 200A 300A 400A French Type Earth Clamp 368025
Great Quality 200A 300A 400A French Type Earth Clamp 368025-368027:
Feature:
The earth clamp can be made of copper,brass or iron.Packaging&Shipping
mehr dazu
According to the customer's need,we ship goods by air,sea and express.
Packing Details: Standard packing or according to the customer's requirements.
Delivery Detail:30-35 days after received the 30 percent deposit.